Fairy trail Bikepark Schladming rebuild 2020 / 2021

Another complete rebuild, the original Fairy Trail was built in 2011. At the time, "Flowtrails" looked a bit different. 10 years later it was time to rebuild the Trail, make use of the corridor to create a new Flowtrail without interfering with nature and or opening new areas. 

Like in Grossarl, the main challenge was to place objects in a smart way to change the Traildesign for a more rhythmic riding experience without changing the existing route too much. 

details:

  • length: 2,0k

  • gradient: 10%

  • construction Time: 40 days

  • Machines: 5t Digger + hydraulic hammer